zk原煤倉(cāng)漏斗下筒壁及柱施工方案
《zk原煤倉(cāng)漏斗下筒壁及柱施工方案》由會(huì)員分享,可在線(xiàn)閱讀,更多相關(guān)《zk原煤倉(cāng)漏斗下筒壁及柱施工方案(27頁(yè)珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。
1、evaluation of scientific development. Nature security type--nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, an
2、d system, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency--quality benefit is to adhere
3、 to the enterprise "survival, profit and development" business truth, adhere to the "all activity is economic activity, all costs can be controlled, money should not be wasted" management philosophy, management analysis, to improve management quality, improve cost control capacity and market competi
4、tiveness. Innovation of science and technology--science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthenin
5、g scientific and technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at t
6、he core, enhance the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious dev
7、elopment of harmonious development--is to construct a "foreign" environment for development. "XING" refers to the "internal security firm and internal management of the internal management measures are effective, harmonious". "Foreign currency" means "Enterprise coordinating development of homeop
8、athy, well, get along with the neighbors better." (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, n
9、o environmental pollution accident. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity ≥ 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of ≥ 306.6 million Yuan, ... BFS++、PI、MIS、SCM Information systems inf
10、rastructure, fully integrated information system to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting cause
11、s and transfer system; to strengthen the training石拉烏素礦井選煤廠(chǎng)原煤倉(cāng)及裝車(chē)控制室漏斗下筒壁及柱施工方案 目 錄 1編制說(shuō)明 3 1.1編制原則 3 1.2編制依據(jù) 3 2 工程概況 3 2.1氣象 3 2.2工程概況 3 2.3工程施工難點(diǎn)分析 4 3 總體施工部署 4 3.1工程項(xiàng)目管理目標(biāo) 4 3.1.1 質(zhì)量目標(biāo) 4 3.1.2 垂直運(yùn)輸機(jī)械布置 4 3.1.3 職業(yè)健康安全管理目標(biāo) 4 3.1.4 環(huán)境管理及現(xiàn)場(chǎng)文明施工目標(biāo) 4 3.1.5 安全質(zhì)量標(biāo)準(zhǔn)化管理
12、目標(biāo) 4 3.4 總體施工順序安排 4 3.4.1 施工區(qū)域劃分 4 3.4.2 施工流向安排 4 3.4.3 流水段劃分 4 4 施工準(zhǔn)備 5 4.1 現(xiàn)場(chǎng)準(zhǔn)備 5 4.1.1 組織準(zhǔn)備 5 4.1.2 現(xiàn)場(chǎng)臨時(shí)道路 5 4.1.3 現(xiàn)場(chǎng)臨時(shí)供水 5 4.1.4 場(chǎng)區(qū)排水 5 4.1.5 臨時(shí)用電 5 4.2技術(shù)準(zhǔn)備 6 4.2.1 施工技術(shù)準(zhǔn)備 6 4.2.2 主要技術(shù)規(guī)范 6 4.3各類(lèi)資源準(zhǔn)備 7 4.3.1 勞動(dòng)力需求計(jì)劃 7 4.3.2 施工機(jī)具需求計(jì)劃 7 5 +0.4米至漏斗筒倉(cāng)倉(cāng)壁、柱施工 8 5.1
13、 +0.4米至漏斗筒倉(cāng)倉(cāng)壁、柱施工 8 5.1.1模板工程 8 5.1.2鋼筋工程 10 5.1.3混凝土工程 11 5.2腳手架工程 11 6 施工進(jìn)度計(jì)劃及保證措施 11 6.1 施工進(jìn)度計(jì)劃 11 6.2 施工進(jìn)度保證措施 11 6.2.1 組織措施 12 6.2.2 技術(shù)措施 12 6.2.3 經(jīng)濟(jì)措施 12 6.2.4 合同措施 12 7 質(zhì)量目標(biāo)及保證措施 13 7.1 質(zhì)量目標(biāo) 13 7.2 建立項(xiàng)目質(zhì)量管理體系 13 7.4 質(zhì)量通病控制措施 18 7.5 成品保護(hù)措施 19 7.5.1 模板工程 19 7.5.2
14、鋼筋工程 19 7.5.3 混凝土工程 19 8 職業(yè)健康安全目標(biāo)及保證措施 20 8.1 安全生產(chǎn)管理目標(biāo) 20 8.2 安全生產(chǎn)保證體系 20 8.3 安全生產(chǎn)管理措施 22 8.3.1安全生產(chǎn)管理規(guī)章制度建立與落實(shí) 22 8.3.2安全生產(chǎn)管理措施 24 8.4 安全防護(hù)管理 25 8.5 現(xiàn)場(chǎng)消防及有毒、易爆物資安全防護(hù)措施 26 9季節(jié)性施工措施 27 9.1 雨季施工措施 27 supervision in large and medium goods vehicle. A is established large vehicles
15、 and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school car test project; II is established motor vehicle test regulatory platform, achieved motor vehicle test full process video, and data remote regulatory; th
16、ree is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification Terminal, and law enforcement records instrument, technology identification means. As to 20XX years June 20 statewide motor vehicle keep volume for 567,408
17、 car, and last year earlier than growth 75,814 car, growth 13.36%; this year January-June, vehicles management section and license archives management section total accepted the motor vehicle registration business 42,543 car times, which registered registration 6,905 car times, and transfer registra
18、tion 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times, and into business 980 car times, and Archives corrections 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business
19、3,640 car times; supervision Survey Section relies on "motor vehicle detection remote issued test qualified logo software platform" supervision motor vehicle test, and identification situation 7418l liangci, investigation motor vehicle exception business 30 car times, his pards business warning 244
20、article, vehicles and driving people sound video regulatory screenshots 1852 Zhang, checks motor vehicle archives 716 pieces times, and medium bus, and medium above truck, and Of hazardous chemicals, vehicles and school buses and other key vehicle inspection record of 420. (C) based on their own
21、, and strict adherence to defense, more cheating, false false fugitive suspects, robbery suspect vehicles and the Internet crackdown. DMV full play to the "first line of Defense" position control, investigating cheating, fake identification and robbery suspect vehicles through operational work, and
22、carefully examine the documents and legal proof, check traffic violations, traffic accidents, the fugitive suspect suspected vehicles and theft than to work, further tight car, driving management business formalities review procedures. ... Truck driver information management platform. Motor vehicl
23、es and traffic police departments, State transport authority to further clarify the Division of labour, implementation responsibility, strengthen our collaboration and management together, reinforcing the management of drivers on which strongly synthetic warfare and information warfare. 3 strictly i
24、mplemented. From May 1 up, a is implemented complex road and bad weather driving exam, currently DMV is urged contractors party in treasures driving school increased simulation Highway, and continuous urgent detours, and snow days, and wet sliding road, and burst situation disposal, subjects II fiel
25、d to driving exam project, is expected27 石拉烏素礦井選煤廠(chǎng)原煤倉(cāng)及裝車(chē)控制室漏斗下筒壁及柱施工方案 1編制說(shuō)明 1.1編制原則 主體施工方案編制遵循以下原則: 1)保證重點(diǎn)、統(tǒng)籌安排,遵守施工合同。 2)依據(jù)工程項(xiàng)目的內(nèi)容,科學(xué)地安排施工程序,合理組織施工,確保各項(xiàng)施工活動(dòng)緊密銜接,加快施工進(jìn)度,縮短工期。 3)選用先進(jìn)的施工技術(shù),合理選擇施工方案,保持質(zhì)量管理體系有效運(yùn)行,確保安全生產(chǎn)和提高工程質(zhì)量。創(chuàng)建全國(guó)工程建設(shè)安全文明施工一流現(xiàn)場(chǎng)和文明施工示范工程。實(shí)現(xiàn)“總體布局模塊化;文明區(qū)域責(zé)任化;安全設(shè)施標(biāo)準(zhǔn)化;工程施工程序化;
26、作業(yè)行為規(guī)范化;施工環(huán)境整潔化”。充分挖掘和利用機(jī)械設(shè)備能力,提高機(jī)械化程度,減輕勞動(dòng)強(qiáng)度和提高勞動(dòng)生產(chǎn)率。 1.2編制依據(jù) 1) 內(nèi)蒙古昊盛煤業(yè)有限公司石拉烏素礦井選煤廠(chǎng)工程原煤倉(cāng)施工圖紙。 2) 現(xiàn)行有效工程建設(shè)規(guī)范、規(guī)程等標(biāo)準(zhǔn),國(guó)家現(xiàn)行法律法規(guī)。 3) 《建筑施工手冊(cè)》。 4)石拉烏素礦井選煤廠(chǎng)總施工組織總設(shè)計(jì)。 2 工程概況 2.1氣象 本區(qū)屬半干旱溫帶高原大陸性氣候。太陽(yáng)輻射強(qiáng)烈,日照豐富,干燥少雨,風(fēng)大沙多,無(wú)霜期短。冬季漫長(zhǎng)寒冷,夏季炎熱短暫,春季回暖升溫快,秋季氣溫下降顯著。凍結(jié)期一般從10月份開(kāi)始到次年的4月份。 2.2工程概況 原煤倉(cāng)及裝車(chē)控制室為3
27、個(gè)φ28m的落地預(yù)應(yīng)力鋼筋混凝土圓筒倉(cāng),單倉(cāng)儲(chǔ)量25666t,建筑體積3*36928m3。結(jié)構(gòu)形式為預(yù)應(yīng)力筒體結(jié)構(gòu),基礎(chǔ)形式為箱型基礎(chǔ)。本工程以絕對(duì)標(biāo)高1338.3m做為設(shè)計(jì)相對(duì)標(biāo)高0.000m,基礎(chǔ)墊層100mm厚C15混凝土,墊層底標(biāo)高-5.1米;墊層上為1.4米厚C30底板,底板上為550mm厚C40環(huán)墻;箱基頂板標(biāo)高為-0.800米。 2.3工程施工難點(diǎn)分析 1) 工程施工工藝復(fù)雜,施工技術(shù)含量高,施工難度大。 2) 工程任務(wù)重,工期緊,專(zhuān)業(yè)隊(duì)伍多。對(duì)施工隊(duì)伍的素質(zhì)和現(xiàn)場(chǎng)組織管理要求高。 3 總體施工部署 3.1工程項(xiàng)目管理目標(biāo) 工程按著GB50326-2006《建
28、設(shè)工程項(xiàng)目管理規(guī)范》要求進(jìn)行, 3.1.1 質(zhì)量目標(biāo) 爭(zhēng)創(chuàng)優(yōu)良工程 3.1.2 垂直運(yùn)輸機(jī)械布置 原煤倉(cāng)設(shè)置二臺(tái)塔吊,覆蓋3座原煤倉(cāng)。 3.1.3 職業(yè)健康安全管理目標(biāo) 杜絕重傷以上事故;無(wú)重大機(jī)械、火災(zāi)事故;無(wú)職業(yè)衛(wèi)生傷害事故;輕傷事故頻率在1‰以下。 3.1.4 環(huán)境管理及現(xiàn)場(chǎng)文明施工目標(biāo) 噪音污染物排放符合國(guó)家標(biāo)準(zhǔn),環(huán)境事故率為零;創(chuàng)文明工地。 3.1.5 安全質(zhì)量標(biāo)準(zhǔn)化管理目標(biāo) 達(dá)到公司安全質(zhì)量標(biāo)準(zhǔn)化工地一級(jí)標(biāo)準(zhǔn)。 3.4 總體施工順序安排 3.4.1 施工區(qū)域劃分 將整原煤倉(cāng)工程劃分為A、B、C號(hào)倉(cāng)3個(gè)施工段。 3.4.2 施工流向安排
29、各施工區(qū)的倉(cāng)按照合理的施工流向組織施工。 3.4.3 流水段劃分 原煤倉(cāng)工程合理劃分為3個(gè)流水段,1個(gè)倉(cāng)為1個(gè)流水段,使人員、機(jī)械設(shè)備得到充分施展,確保工期按時(shí)完成。 4 施工準(zhǔn)備 4.1 現(xiàn)場(chǎng)準(zhǔn)備 4.1.1 組織準(zhǔn)備 項(xiàng)目經(jīng)理部按照項(xiàng)目管理要求進(jìn)行勞動(dòng)力組織和施工安排,隨施工進(jìn)度對(duì)資源進(jìn)行合理配置及動(dòng)態(tài)管理,實(shí)行流水作業(yè),確保工期、安全、質(zhì)量、成本等目標(biāo)的實(shí)現(xiàn) 根據(jù)本工程的施工特點(diǎn),在工程施工中,組建強(qiáng)有力的項(xiàng)目領(lǐng)導(dǎo)班子,組織一流的技術(shù)管理人員和施工管理人員,建立完善的質(zhì)量管理、工期管理、職業(yè)健康、安全管理和環(huán)境管理體系,確保各項(xiàng)目標(biāo)的實(shí)現(xiàn)。 4.1.2 現(xiàn)場(chǎng)臨時(shí)道
30、路 場(chǎng)區(qū)臨時(shí)道路及排水溝根據(jù)現(xiàn)場(chǎng)實(shí)際情況布置,場(chǎng)區(qū)內(nèi)臨時(shí)道路根據(jù)工業(yè)廣場(chǎng)總平面圖確定,盡可能利用廠(chǎng)區(qū)的永久道路,根據(jù)永久道路的標(biāo)高和作法,先把路基作好,壓路機(jī)碾壓,在臨時(shí)道路兩側(cè)做好臨時(shí)排水溝,把地表水及部分地下滲水排出場(chǎng)外,保證工程在雨季施工中能夠正常行車(chē)。不能利用廠(chǎng)區(qū)道路時(shí),布置施工現(xiàn)場(chǎng)臨時(shí)道路,臨時(shí)道路用壓路機(jī)碾壓密實(shí)。以滿(mǎn)足施工和消防要求。 4.1.3 現(xiàn)場(chǎng)臨時(shí)供水 水源由業(yè)主提供。水源引入點(diǎn)根據(jù)業(yè)主提供的方案確定,具體布置見(jiàn)施工總平面布置圖?,F(xiàn)場(chǎng)供水采用直埋管道。從甲方提供水源處引出管道通向原煤倉(cāng)施工點(diǎn)處,管徑為150mm。埋地管網(wǎng)埋深在冰凍線(xiàn)以下。 4.1.4 場(chǎng)區(qū)排水
31、 在鋼筋場(chǎng)區(qū)地面硬化時(shí)做好場(chǎng)區(qū)排水,排水坡度0.5%,鋼筋排水排向鋼筋場(chǎng)地的西側(cè)。 4.1.5 臨時(shí)用電 ①施工電源由甲方提供電源接一個(gè)箱式變壓器接入用電施工區(qū)域。A倉(cāng)塔吊處設(shè)置一個(gè)二級(jí)配電箱,鋼筋棚處設(shè)置一個(gè)二級(jí)配電箱,分別在三個(gè)倉(cāng)邊緣處個(gè)設(shè)置一個(gè)二級(jí)配電箱滿(mǎn)足倉(cāng)內(nèi)施工需要。 電線(xiàn)、電纜截面選擇地面動(dòng)力主電纜根據(jù)<臨電施工組織設(shè)計(jì)>電量計(jì)算數(shù)據(jù)選用符合要求的五芯電纜;塔吊采用 VV29-1000V 335+225;砼輸送泵采用VV29-1000V 370+216;鋼筋切斷器等7.5KW以下配YC-500V32.5+21.5 mm2電纜;電焊機(jī)采用YC-500V36 mm2電纜;對(duì)
32、焊機(jī)采用YC-500V325 mm2電纜;現(xiàn)場(chǎng)照明采用10mm2電纜。 ②供電分區(qū)設(shè)計(jì)場(chǎng)區(qū)動(dòng)力用電及場(chǎng)區(qū)照明設(shè)計(jì) 采用電纜埋地敷設(shè),埋深700mm,場(chǎng)區(qū)照明在塔吊河鋼筋棚處設(shè)置滴燈,能夠保證在夜間正常行車(chē);在各木工棚及鋼筋棚均設(shè)照明燈,在每個(gè)燈位上分設(shè)開(kāi)關(guān),對(duì)每個(gè)燈進(jìn)行控制。 4.2技術(shù)準(zhǔn)備 4.2.1 施工技術(shù)準(zhǔn)備 根據(jù)陸續(xù)出圖的特點(diǎn),認(rèn)真學(xué)習(xí)施工圖紙了解設(shè)計(jì)意圖和相關(guān)規(guī)范,掌握本工程建筑、結(jié)構(gòu)的形式和特點(diǎn),明確各專(zhuān)業(yè)的設(shè)計(jì)要求合理組織。 b.考察施工現(xiàn)場(chǎng),督促業(yè)主在工程開(kāi)工前保證施工現(xiàn)場(chǎng)具備開(kāi)工條件。施工臨時(shí)用水、用電、通訊線(xiàn)路接至施工場(chǎng)地指定地點(diǎn)。同時(shí),由項(xiàng)目工程師協(xié)同工
33、程測(cè)量人員會(huì)同建設(shè)單位及有關(guān)部門(mén),交接水準(zhǔn)點(diǎn)及定位基準(zhǔn)點(diǎn);布置平面和高程控制點(diǎn),做好定位放線(xiàn)工作。 c.由項(xiàng)目經(jīng)理組織各部門(mén)管理人員做好質(zhì)量策劃工作。項(xiàng)目工程師組織各專(zhuān)業(yè)技術(shù)人員編制單位工程施工組織設(shè)計(jì)和各專(zhuān)業(yè)專(zhuān)項(xiàng)施工方案,并對(duì)管理人員進(jìn)行技術(shù)交底。 d.根據(jù)總體時(shí)標(biāo)網(wǎng)絡(luò)控制計(jì)劃,安排月、日施工作業(yè)計(jì)劃。并提出各種成品、半成品及主要材料需求計(jì)劃。 e.收集本項(xiàng)目施工使用的現(xiàn)行有效文件、標(biāo)準(zhǔn)、規(guī)范及圖集。 f.確定水泥、砂及石料生產(chǎn)廠(chǎng)家,并取樣試驗(yàn),進(jìn)行各種配合比準(zhǔn)備。 g.對(duì)施工需要的檢驗(yàn)、測(cè)量和試驗(yàn)設(shè)備進(jìn)行計(jì)量檢定。 4.2.2 主要技術(shù)規(guī)范 《粉煤灰混凝土應(yīng)用技術(shù)規(guī)程》GB
34、J146-90 《混凝土結(jié)構(gòu)試驗(yàn)方法標(biāo)準(zhǔn)》GB50152-92 《混凝土質(zhì)量控制標(biāo)準(zhǔn)》GB50164-92 《組合鋼模板技術(shù)規(guī)范》GB50214-2001 《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》GB50300-2001 《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB50204-2002 《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》GB50010-2002 《鋼筋焊接及驗(yàn)收規(guī)程》(JGJ18-2003) 《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》JGJ130-2001 《建設(shè)工程項(xiàng)目管理規(guī)范》GB/T50326-2006 4.3各類(lèi)資源準(zhǔn)備 4.3.1 勞動(dòng)力需求計(jì)劃 勞動(dòng)力需求計(jì)劃 土建工程 日期
35、 工種 10月 11月 鋼筋工 40 50 木工 80 100 砼工 10 15 電工 2 2 電焊工 5 5 大小型司機(jī) 3 3 合計(jì) 4.3.2 施工機(jī)具需求計(jì)劃 施工機(jī)具需求計(jì)劃 土建工程 序號(hào) 機(jī)械或 設(shè)備名稱(chēng) 型號(hào) 規(guī)格 數(shù)量 備注 1 塔吊 QTZ6015 2臺(tái) 2 水 準(zhǔn) 儀 1 3 砼輸送泵 2 4 鋼筋切斷機(jī) ZGQ40A 4 5 鋼筋調(diào)直機(jī) 2 6 鋼筋彎曲機(jī) WJ40-1 4 7 閃光對(duì)焊
36、機(jī) UN1-100 2 8 交流電焊機(jī) BX1-500 10 9 螺紋套絲機(jī) 2 10 振搗棒 φ50/φ30 6 11 圓盤(pán)鋸 MJ104 1 12 砂輪切割機(jī) 2 13 全站儀 1 14 經(jīng)緯儀 1 5 -0.8米至漏斗筒倉(cāng)倉(cāng)壁、柱施工 5.1 -0.8米至漏斗筒倉(cāng)倉(cāng)壁、柱施工 5.1.1模板工程 5.1.1.1框架柱模安裝 a.根據(jù)工程結(jié)構(gòu)型式和特點(diǎn)及現(xiàn)場(chǎng)施工條件,柱模板采用定型鋼模板。 b.工藝流程:彈柱位置線(xiàn)→抹找平層作定位墩→安裝柱模板→安柱箍→安拉桿或斜撐→辦預(yù)
37、檢 1.按標(biāo)高抹好水泥砂漿找平層,按位置線(xiàn)做好定位墩臺(tái),以便保證柱軸線(xiàn)邊線(xiàn)與標(biāo)高的準(zhǔn)確,或者按照放線(xiàn)位置,在柱四邊離地5~8cm處的主筋上焊接支桿,從四面頂住模板,以防止位移。 2.安裝柱模板:通排柱,先裝兩端柱,經(jīng)校正、固定、拉通線(xiàn)校正中間各柱。模板按柱子大小,預(yù)拼成一面一片(一面的一邊帶一個(gè)角膜),或兩面一片,就位后先用鉛絲與主筋綁扎臨時(shí)固定,用U形卡將兩側(cè)模板連接卡緊,安裝完兩面再安另外兩面模板。 3.安裝柱箍:柱箍可用角鋼、鋼管等制成,采用木模板時(shí)可用螺栓、方木制作鋼木箍。柱箍應(yīng)根據(jù)拉模尺寸、側(cè)壓力大小,在模板設(shè)計(jì)中確定柱箍尺寸間 安裝柱模的拉桿或斜撐:柱模每邊設(shè)2根拉桿,固定
38、于事先預(yù)埋在樓板內(nèi)的鋼筋環(huán)上,用經(jīng)緯儀控制,用花籃螺栓調(diào)節(jié)校正模板垂直度。拉桿與地面夾角直為45,預(yù)埋的鋼筋環(huán)與柱距離宜為3/4柱高。 4.將柱模內(nèi)清理干凈,封閉清理口,辦理柱模預(yù)檢。 5.1.1.2筒壁及附壁柱模安裝 筒壁模板安裝工藝:組裝前檢查→安裝第一步模板 (兩側(cè))→安裝內(nèi)楞→調(diào)整模板平直→安裝第二步至頂部?jī)蓚?cè)模板→安裝內(nèi)楞調(diào)平直→安裝對(duì)拉螺栓→安裝內(nèi)外鋼楞→加斜撐并調(diào)模板→檢查加固 a. 模板安裝前,應(yīng)進(jìn)行下列工作:檢查面板清潔度;復(fù)合基層上內(nèi)外模板控制線(xiàn)和標(biāo)高;涂刷脫模劑,且脫模劑應(yīng)均勻。 b.在安裝模板前,按位置線(xiàn)安裝模板,與墻體鋼筋固定。 c.安裝模板邊線(xiàn)必須兩側(cè)模
39、板同時(shí)安裝。環(huán)墻采用12mm凈面木模板;后背40mm*90mm立木方,豎向間距200mm;水平采用10#槽鋼,水平間距1000mm,對(duì)拉螺栓Ф14螺栓(兩頭絲)加固。詳見(jiàn)下圖: d.筒壁模板的背部支撐由三層(木方、鋼管和槽鋼)組成:直接支撐模板的為木方;用以支撐木方的為槽鋼。組裝墻體模板時(shí),通過(guò)穿墻螺栓將墻體兩側(cè)模板拉結(jié),每個(gè)穿墻螺栓成為鋼管的支點(diǎn)。墻模板一次支3.2米高,至HL1底部。 e.筒壁模板安裝時(shí)必須保證筒壁的厚度,筒壁厚度為550mm。 f.模板之間應(yīng)連接緊密,模板間的拼縫應(yīng)平整、嚴(yán)密,模板支撐應(yīng)設(shè)置正確、連接牢固。 g.模板豎向拼縫設(shè)置在豎肋位置,并在接縫處貼單面膠條
40、;水平拼縫位置一般無(wú)橫肋,拼縫處用單面密封條貼好,再用膠帶紙封嚴(yán);將豎向模板下部的縫隙封堵嚴(yán)密。為防止密封條擠壓后凸出板面,在模板側(cè)面退后板面1~3mm粘貼。 5.1.2鋼筋工程 原煤倉(cāng)環(huán)墻有附壁柱,施工中先綁扎柱子鋼筋,再綁扎環(huán)墻鋼筋。柱子中φ20以上鋼筋采用直螺紋接頭,接頭質(zhì)量必須符合GB50204-2002的規(guī)定,柱子主筋要垂直,箍筋要扎緊,開(kāi)口沿柱高分開(kāi)布置。剪力墻鋼筋接頭采用綁扎接頭,接頭部位用三道綁絲綁扎牢固,同一截面內(nèi)接頭數(shù)量不超過(guò)墻筋總數(shù)的50%,且應(yīng)交錯(cuò)布置,剪力墻鋼筋網(wǎng)相交點(diǎn)應(yīng)每點(diǎn)綁牢,綁扎點(diǎn)的綁扎絲須成“八”字形,以免網(wǎng)片彎斜變形。雙排鋼筋兩側(cè)分別加設(shè)塑料墊塊,呈梅花
41、形布置,間距600mm,以保證混凝土保護(hù)層厚度。為了保證筒壁上口鋼筋保護(hù)層均勻,采用下圖做法: 柱鋼筋綁扎工藝流程:套柱箍筋→搭接豎向受力筋→畫(huà)箍筋間距線(xiàn)→綁箍筋。圖紙?jiān)O(shè)計(jì)要求間距計(jì)算好每根柱箍筋數(shù)量,先將柱箍套在下層伸出的搭接筋上,然后立柱子鋼筋,主筋接頭的位置依設(shè)計(jì)50%要求錯(cuò)開(kāi),在立好的柱子豎向鋼筋上,用石筆畫(huà)出箍筋間距,然后將已套好的箍筋往上移動(dòng),由上往下宜采用纏扣綁扎。箍筋與主筋要垂直,箍筋轉(zhuǎn)角與主筋交點(diǎn)均要綁扎,主筋與箍筋非轉(zhuǎn)角部分的相交點(diǎn)成梅花交錯(cuò)綁扎,保護(hù)層塑料環(huán)墊塊在外豎筋上,間距1000mm。 5.1.3混凝土工程 5.1.3.1混凝土攪拌 砼采用商品混凝土,首
42、先進(jìn)行砼初凝,終凝試驗(yàn),測(cè)定出砼初凝時(shí)間和終凝時(shí)間。 5.1.3.2混凝土澆灌要求: 嚴(yán)格按重量比控制砼的配合比。 5.1.3.3模板上口的殘余砼,必須由砼工在澆完砼后馬上清理干凈。5.1.3.4應(yīng)嚴(yán)格控制分層澆筑的間隔時(shí)間。分層厚度不宜超過(guò)500mm。須嚴(yán)格執(zhí)行砼分層交圈均勻澆筑速度。 5.1.3.5振搗砼不應(yīng)觸及支承桿,鋼筋和模板,混凝土應(yīng)振搗均勻,嚴(yán)禁漏振、過(guò)振,振振搗棒插入下層混凝土表面的深度不可超過(guò)50mm。 5.1.3.6砼出模后,表面缺陷要及時(shí)修飾,保持砼表面平整,抹子壓光,修補(bǔ)時(shí)所有予留孔、予埋件要鑿出。 5.1.3.7砼養(yǎng)護(hù)采取澆水養(yǎng)護(hù)。 5.1.3.8混凝土澆
43、筑前應(yīng)保持模板內(nèi)清潔、無(wú)積水。 5.2腳手架工程 本工程+0.4米至漏斗處筒壁施工時(shí)采用挑腳手架施工,漏斗及以下柱支設(shè)采用滿(mǎn)堂腳手架及快拆支撐體系。各種腳手架施工前均要編制搭設(shè)方案。所有腳手架按編制的搭設(shè)方案進(jìn)行施工后,必須由項(xiàng)目部專(zhuān)職安全員等有關(guān)人員參加驗(yàn)收合格后方可使用。 6 施工進(jìn)度計(jì)劃及保證措施 6.1 施工進(jìn)度計(jì)劃 簽訂工程總承包合同后,將充分利用我公司多年來(lái)一直在中國(guó)進(jìn)行選煤廠(chǎng)總承包建設(shè)的設(shè)計(jì)、施工和管理經(jīng)驗(yàn),作好充分施工準(zhǔn)備和組織工作,順利完成石拉烏素礦井選煤廠(chǎng)總承包建設(shè)任務(wù)。我們將充分利用這一優(yōu)勢(shì),把原煤倉(cāng)作為重點(diǎn)工程,利用我公司特有的設(shè)計(jì)人才資源優(yōu)勢(shì),在最短時(shí)間
44、內(nèi)把土建工程圖紙完成,搶工期、搶進(jìn)度,在最短的時(shí)間內(nèi)完成施工任務(wù)。 6.2 施工進(jìn)度保證措施 制定三級(jí)控制保證計(jì)劃:根據(jù)總控計(jì)劃編月進(jìn)度計(jì)劃,以月度計(jì)劃控制周計(jì)劃,以周控制日作業(yè)計(jì)劃。根據(jù)進(jìn)度、工程量和流水段劃分合理安排勞動(dòng)力和投入生產(chǎn)設(shè)備,保證按照進(jìn)度計(jì)劃的要求完成任務(wù)。加強(qiáng)操作人員對(duì)質(zhì)量意識(shí)的培養(yǎng),提高施工質(zhì)量和一次合格率,從而可以保證施工進(jìn)度。加強(qiáng)例會(huì)制度,解決矛盾、協(xié)調(diào)關(guān)系,保證按照施工進(jìn)度計(jì)劃進(jìn)行。在實(shí)行“項(xiàng)目管理”的基礎(chǔ)上實(shí)行“目標(biāo)管理”,根據(jù)質(zhì)量目標(biāo)、安全目標(biāo)、工期目標(biāo)實(shí)行行之有效的管理,在工程中采取“工序”管理模式,隨時(shí)隨地按國(guó)家質(zhì)量標(biāo)準(zhǔn)跟蹤檢查,力爭(zhēng)一次成優(yōu),確保主要工
45、序、關(guān)鍵路線(xiàn)按期或提前完成。 6.2.1 組織措施 根據(jù)工程施工難度大、工期緊的特點(diǎn),公司抽調(diào)具有類(lèi)似工程項(xiàng)目管理經(jīng)驗(yàn)又精明能干的人員,組成一級(jí)項(xiàng)目經(jīng)理部。實(shí)行項(xiàng)目施工管理模式,建立以項(xiàng)目經(jīng)理為首的管理層全權(quán)組織施工諸要素,實(shí)行項(xiàng)目經(jīng)理負(fù)責(zé)制對(duì)合同履約、工程質(zhì)量、工期、安全生產(chǎn)、項(xiàng)目成本等全面負(fù)責(zé)。各工程處成立二級(jí)項(xiàng)目部,具體組織落實(shí)各自片區(qū)內(nèi)的工程質(zhì)量、工期、安全生產(chǎn)工作。 6.2.2 技術(shù)措施 1) 加強(qiáng)技術(shù)管理工作,精心施工,合理安排施工程序和交叉流水作業(yè),加快施工進(jìn)度,縮短施工周期。認(rèn)真熟悉圖紙及規(guī)范要求,加強(qiáng)與設(shè)計(jì)院、監(jiān)理、甲方在技術(shù)方面溝通,把設(shè)計(jì)變更處理在施工之前。
46、 推廣和應(yīng)用新技術(shù)、新工藝、新材料、改進(jìn)施工方法,優(yōu)化施工提高工作效率,加快施工進(jìn)度。 利用微機(jī)管理提高管理水平。科學(xué)制定施工進(jìn)度網(wǎng)絡(luò)計(jì)劃,強(qiáng)化計(jì)劃管理,加強(qiáng)日進(jìn)度計(jì)劃控制,旬月進(jìn)度計(jì)劃考核,以日保旬,以旬保月,以月保總工期的實(shí)現(xiàn)。 作好各種影響施工進(jìn)度因素的預(yù)防工作,配備發(fā)電機(jī)、蓄水箱、防雨布、保溫材料等,把不利因素降到最低點(diǎn)。加強(qiáng)團(tuán)結(jié)協(xié)作,根據(jù)礦區(qū)總體工期安排,從大局出發(fā),處理好外部協(xié)調(diào)工作。 加強(qiáng)設(shè)備管理及時(shí)檢修,保證施工過(guò)程中各種機(jī)械正常運(yùn)行,防止因設(shè)備影響工期。 6.2.3 經(jīng)濟(jì)措施 公司儲(chǔ)備重點(diǎn)項(xiàng)目資金,以備業(yè)主資金暫時(shí)不到位時(shí)急用,保證資源投入確保工程連續(xù)施工。做到專(zhuān)
47、款專(zhuān)用,沒(méi)有項(xiàng)目經(jīng)理簽字不能動(dòng)用資金。 6.2.4 合同措施 項(xiàng)目部堅(jiān)持每日召開(kāi)生產(chǎn)調(diào)度例會(huì),嚴(yán)格執(zhí)行總體網(wǎng)絡(luò)進(jìn)度計(jì)劃,使工程施工始終能按計(jì)劃順利有序的進(jìn)行。以總控計(jì)劃為指導(dǎo),各分項(xiàng)工程計(jì)劃必須在總進(jìn)度計(jì)劃的限定時(shí)間內(nèi),認(rèn)真實(shí)施完成,制定控制點(diǎn),實(shí)行目標(biāo)管理。項(xiàng)目部與專(zhuān)業(yè)分包、勞務(wù)分包單位簽訂的合同,工期單獨(dú)作為合同履行的重要一項(xiàng)考核內(nèi)容。 7 質(zhì)量目標(biāo)及保證措施 7.1 質(zhì)量目標(biāo) 1) 符合規(guī)范要求,工程質(zhì)量達(dá)到優(yōu)良。 2) 爭(zhēng)創(chuàng)“魯班獎(jiǎng)” 7.2 建立項(xiàng)目質(zhì)量管理體系 7.2.1 項(xiàng)目部人員質(zhì)量職責(zé) 1) 項(xiàng)目經(jīng)理:負(fù)責(zé)建立本項(xiàng)目部質(zhì)量管理體系,并有效運(yùn)行,確保
48、質(zhì)量目標(biāo)的實(shí)現(xiàn)。 組織編制和審核本項(xiàng)目的施工組織設(shè)計(jì)、工程質(zhì)量計(jì)劃,合理配置資源,科學(xué)組織施工,對(duì)工程質(zhì)量負(fù)全面責(zé)任。 制定本項(xiàng)目的各類(lèi)人員質(zhì)量崗位職責(zé),建立本項(xiàng)目部的質(zhì)量管理制度。 組織職工質(zhì)量意識(shí)與技術(shù)業(yè)務(wù)素質(zhì)的培訓(xùn),確保關(guān)鍵工序,特殊工序操作人員培訓(xùn)合格并持證上崗。 組織對(duì)分部工程質(zhì)量檢查評(píng)定。 負(fù)責(zé)工程項(xiàng)目質(zhì)量缺陷及質(zhì)量事故的處理。 負(fù)責(zé)工程項(xiàng)目的質(zhì)量回訪(fǎng)與保修。 2) 項(xiàng)目工程師:負(fù)責(zé)本項(xiàng)目部質(zhì)量管理體系的建立和運(yùn)行,具體負(fù)責(zé)項(xiàng)目部的質(zhì)量工作。主持施工組織設(shè)計(jì)、質(zhì)量計(jì)劃的編制,并貫徹實(shí)施。 組織項(xiàng)目部圖紙自審,審批技術(shù)交底、特殊工序、關(guān)鍵工序施工措施。 負(fù)責(zé)組織分項(xiàng)
49、工程質(zhì)量檢驗(yàn)和評(píng)定。 負(fù)責(zé)新技術(shù)、新工藝在本項(xiàng)目的推廣應(yīng)用。 主持召開(kāi)項(xiàng)目部質(zhì)量例會(huì),分析存在的質(zhì)量問(wèn)題,制定糾正或預(yù)防措施。成立多層次的質(zhì)量管理活動(dòng)小組,組織小組活動(dòng)。 3) 技術(shù)員:參加圖紙會(huì)審,編制施工組織設(shè)計(jì)、施工方案、創(chuàng)優(yōu)措施,審查分包工程施工方案,在施工過(guò)程中監(jiān)督各項(xiàng)施工措施的落實(shí)。 施工過(guò)程中及時(shí)編制有針對(duì)性的分部分項(xiàng)工程作業(yè)指導(dǎo)書(shū),并向作業(yè)人員進(jìn)行交底,做好交底記錄。 做好各項(xiàng)技術(shù)復(fù)核和隱蔽驗(yàn)收,及時(shí)填寫(xiě)、整理、歸檔施工技術(shù)資料。 確定質(zhì)量管理點(diǎn),辨識(shí)特殊過(guò)程和關(guān)鍵工序,控制工程質(zhì)量。 參加項(xiàng)目部全面質(zhì)量管理活動(dòng),不斷改進(jìn)施工工藝,提高工程質(zhì)量。 參加項(xiàng)目部的
50、質(zhì)量檢查及評(píng)定,針對(duì)施工中的質(zhì)量問(wèn)題,制定糾正措施。 4) 質(zhì)量員:負(fù)責(zé)履行各項(xiàng)質(zhì)量監(jiān)督職能,對(duì)施工過(guò)程進(jìn)行監(jiān)督檢查。 組織有關(guān)人員(施工員、班組長(zhǎng)),對(duì)檢驗(yàn)批質(zhì)量進(jìn)行檢查評(píng)定,填寫(xiě)檢驗(yàn)批質(zhì)量驗(yàn)收記錄。 參加分項(xiàng)工程、分部工程、單位工程檢查評(píng)定和竣工驗(yàn)收。 材料員:負(fù)責(zé)工程項(xiàng)目所需物資的采購(gòu)、驗(yàn)證并保管相關(guān)資料,負(fù)責(zé)供貨單共提供產(chǎn)品的驗(yàn)證、保管,負(fù)責(zé)對(duì)采購(gòu)的物資和顧客提供的產(chǎn)品進(jìn)行標(biāo)識(shí),負(fù)責(zé)進(jìn)場(chǎng)物資的搬運(yùn)、貯存、包裝,負(fù)責(zé)不合格物資的退貨與更換。 5)試驗(yàn)員:及時(shí)對(duì)項(xiàng)目購(gòu)進(jìn)材料、構(gòu)件和半成品進(jìn)行抽樣,提出委托試驗(yàn)并負(fù)責(zé)送試驗(yàn)室檢驗(yàn),嚴(yán)格按照施工規(guī)范要求進(jìn)行現(xiàn)場(chǎng)測(cè)試,并做好記錄,負(fù)
51、責(zé)收集、整理施工過(guò)程中形成的試驗(yàn)報(bào)告、現(xiàn)場(chǎng)測(cè)試報(bào)告。 6)測(cè)量員:根據(jù)甲方提供的已知座標(biāo)點(diǎn)及水準(zhǔn)點(diǎn)引入建筑物坐標(biāo)及高程。根據(jù)建筑總平面、施工總平面等布設(shè)測(cè)量控制網(wǎng),埋置控制坐標(biāo)網(wǎng)點(diǎn),嚴(yán)格控制建筑物軸線(xiàn)偏差及水準(zhǔn)標(biāo)高。 7)計(jì)量員:計(jì)量管理的內(nèi)容包括:計(jì)量器具管理和計(jì)量過(guò)程管理. 施工過(guò)程中的計(jì)量過(guò)程包括:原材料、半成品進(jìn)場(chǎng)驗(yàn)收;測(cè)量放線(xiàn);施工過(guò)程用料計(jì)量;施工過(guò)程質(zhì)量檢驗(yàn);施工過(guò)程試驗(yàn); 建立項(xiàng)目部計(jì)量器具臺(tái)帳使用計(jì)量器具前,檢查計(jì)量器具是否在有效使用期內(nèi),是否進(jìn)行了檢定,對(duì)項(xiàng)目部的計(jì)量器具制定檢定計(jì)劃,按時(shí)檢定,達(dá)不到精度要求的計(jì)量器具應(yīng)及時(shí)報(bào)廢和降級(jí)使用,確保計(jì)量器具處于良好狀態(tài)。
52、計(jì)量過(guò)程中,計(jì)量人員嚴(yán)格執(zhí)行計(jì)量操作規(guī)程,保證數(shù)據(jù)準(zhǔn)確,滿(mǎn)足工程施工的需要。 8)施工員:熟悉本職責(zé)范圍內(nèi)施工圖紙、質(zhì)量標(biāo)準(zhǔn)、技術(shù)規(guī)范、企業(yè)標(biāo)準(zhǔn),做到按圖、 按規(guī)范、按標(biāo)準(zhǔn)施工。 根據(jù)生產(chǎn)進(jìn)度計(jì)劃編制作業(yè)計(jì)劃,具體實(shí)施項(xiàng)目施工的管理,對(duì)本工種工程質(zhì)量負(fù)責(zé)。 將質(zhì)量職責(zé)落實(shí)到本工種成員,并嚴(yán)格考核,組織好質(zhì)量自檢、互檢、交接檢,確保不合格工程不轉(zhuǎn)序,及時(shí)填寫(xiě)有關(guān)質(zhì)量記錄。 7.2.2 材料采購(gòu)控制 項(xiàng)目物資需求計(jì)劃,包括項(xiàng)目物資總計(jì)劃及進(jìn)度要求編制的季(月)度物資計(jì)劃技術(shù)員首先提出工程用材料、設(shè)備計(jì)劃,經(jīng)項(xiàng)目經(jīng)理審批簽字后,報(bào)供應(yīng)部門(mén)執(zhí)行。 供應(yīng)部門(mén)對(duì)采購(gòu)的原材料進(jìn)行名稱(chēng)、型號(hào)、
53、數(shù)量、外觀質(zhì)量、質(zhì)保書(shū)、技術(shù)資料及各項(xiàng)試驗(yàn)參數(shù)進(jìn)行認(rèn)真驗(yàn)證,并做好記錄,資料保管和歸檔工作。 經(jīng)驗(yàn)證合格的原材料、設(shè)備的合格證、技術(shù)資料應(yīng)報(bào)項(xiàng)目部審批后方準(zhǔn)進(jìn)場(chǎng)使用,不合格的材料、設(shè)備嚴(yán)禁使用。 材料及設(shè)備必須分類(lèi)堆放儲(chǔ)存,掛標(biāo)示牌,建立使用跟蹤臺(tái)帳,確保材料的可追溯性。 按規(guī)定應(yīng)做復(fù)試的,必須按規(guī)定取樣進(jìn)行復(fù)試,材料從進(jìn)貨到使用流程見(jiàn)下圖: 材料計(jì)劃→外觀、質(zhì)保書(shū)等驗(yàn)證→貯存、復(fù)驗(yàn)→材料使用 7.2.3 施工設(shè)備管理 1) 項(xiàng)目部在編制施工組織設(shè)計(jì)時(shí),根據(jù)項(xiàng)目特點(diǎn),識(shí)別本項(xiàng)目對(duì)施工設(shè)備的需求,并在施工組織設(shè)計(jì)中予以明確,或單獨(dú)形成需求計(jì)劃上報(bào)主管部門(mén)批準(zhǔn)。工程處設(shè)備主管部門(mén)對(duì)項(xiàng)
54、目部上報(bào)的設(shè)備需求計(jì)劃,根據(jù)本單位設(shè)備現(xiàn)狀和施工進(jìn)度的需求,采用內(nèi)部租賃、外部租賃和外購(gòu)等形式,組織設(shè)備進(jìn)場(chǎng),滿(mǎn)足施工要求。 2) 項(xiàng)目部明確專(zhuān)人負(fù)責(zé)施工設(shè)備的管理,建立明確的崗位責(zé)任制,建立健全設(shè)備管理臺(tái)帳、設(shè)備運(yùn)轉(zhuǎn)記錄、維修保養(yǎng)記錄、操作人員臺(tái)帳、設(shè)備租賃合同等。 3) 塔吊、起重吊裝設(shè)備操作者和出租方設(shè)備操作人員必須持有特種作業(yè)證書(shū)。中小型設(shè)備操作者必須持有相關(guān)部門(mén)頒發(fā)的上崗證書(shū)”。 7.2.4 施工過(guò)程質(zhì)量管理 1) 項(xiàng)目部組織有關(guān)人員根據(jù)施工圖紙按單位工程各分部、分項(xiàng)工程的施工難易、質(zhì)量特性重要性、工藝成熟程度、操作熟練程度及產(chǎn)品質(zhì)量驗(yàn)證的難易程度等,將其施工過(guò)程進(jìn)行策劃,
55、策劃結(jié)果在施工組織設(shè)計(jì)或其補(bǔ)充文件中詳細(xì)列出,如過(guò)程名稱(chēng)、擬設(shè)立的質(zhì)量管理點(diǎn)明細(xì)表、特殊過(guò)程一覽表等。 2) 質(zhì)量管理點(diǎn)的檢驗(yàn)頻次和檢驗(yàn)責(zé)任、手段,在技術(shù)交底書(shū)或“質(zhì)量管理點(diǎn)明細(xì)表”中明確。需要時(shí),可補(bǔ)充編制質(zhì)量管理點(diǎn)工藝指導(dǎo)書(shū),經(jīng)項(xiàng)目工程師批準(zhǔn)后,作為技術(shù)交底書(shū)的補(bǔ)充。 3) 特殊過(guò)程控制的要點(diǎn)在于事先的能力鑒定和過(guò)程操作中的參數(shù)監(jiān)控,操作前項(xiàng)目工程師組織對(duì)人員的資格、設(shè)備的性能、檢測(cè)設(shè)備的試用性、操作方法及工藝文件等進(jìn)行確認(rèn),填寫(xiě)“特殊過(guò)程鑒定記錄”以備追溯。操作過(guò)程中施工技術(shù)員按工藝文件的規(guī)定進(jìn)行參數(shù)監(jiān)控,填寫(xiě)“特殊過(guò)程實(shí)施記錄”或某些專(zhuān)用記錄。特殊過(guò)程在監(jiān)控中如發(fā)現(xiàn)異常波動(dòng),應(yīng)及時(shí)
56、糾正偏差,并進(jìn)行再次確認(rèn)。 a.施工技術(shù)人員在每個(gè)分項(xiàng)工程施工前對(duì)分項(xiàng)工程的工序、工序的具體內(nèi)容等,向班組做詳細(xì)的技術(shù)交底。 b.根據(jù)質(zhì)量驗(yàn)評(píng)標(biāo)準(zhǔn)和本工程的實(shí)際情況合理劃分分項(xiàng)工程,及時(shí)收集整理分項(xiàng)工程相對(duì)應(yīng)的技術(shù)保證資料。 c.班組在分項(xiàng)工程施工完畢,必須認(rèn)真進(jìn)行班組自檢,在自檢中對(duì)發(fā)現(xiàn)的問(wèn)題進(jìn)行糾正,達(dá)到驗(yàn)收標(biāo)準(zhǔn)后填寫(xiě)分項(xiàng)工程自檢記錄。分項(xiàng)工序報(bào)驗(yàn)程序?yàn)椋喊嘟M自檢→工種交接檢→專(zhuān)職質(zhì)檢→報(bào)驗(yàn)監(jiān)理。 d.施工過(guò)程中,檢查人員隨時(shí)跟蹤檢查。 e.項(xiàng)目部每月進(jìn)行一次質(zhì)量大檢查,針對(duì)存在的問(wèn)題,開(kāi)質(zhì)量分析會(huì),找出質(zhì)量上存在的問(wèn)題。提出糾正和防范措施。 f.成立以施工員、質(zhì)量檢查員為首的
57、QC小組,對(duì)隨時(shí)隨地的抽檢結(jié)果進(jìn)行統(tǒng)計(jì)分析,找出問(wèn)題,提出改進(jìn)措施,實(shí)現(xiàn)每個(gè)分項(xiàng)工程,每道工序都受到合理有效的控制。 g.對(duì)軸線(xiàn)、標(biāo)高、幾何尺寸、預(yù)留孔位置及尺寸的交接等進(jìn)行認(rèn)真的技術(shù)復(fù)核,以保證施工準(zhǔn)確和可追溯性。 h.對(duì)鋼筋工程,門(mén)窗工程的固定、預(yù)埋、施工、電器線(xiàn)路及其它各類(lèi)完工后無(wú)法進(jìn)行檢驗(yàn)的工程進(jìn)行隱蔽工程驗(yàn)收,確保隱蔽工程符合設(shè)計(jì)、規(guī)范標(biāo)準(zhǔn)和可追溯性。 i.強(qiáng)化文件和工程技術(shù)資料的管理。建立以項(xiàng)目技術(shù)負(fù)責(zé)人為中心、技術(shù)人員、檢查人員、材料人員和資料員等參加和工程技術(shù)資料和文件保證體系。對(duì)施工圖紙、圖集、質(zhì)量標(biāo)準(zhǔn)、驗(yàn)收規(guī)范等對(duì)質(zhì)量有關(guān)和文件進(jìn)行統(tǒng)一管理。并列出本項(xiàng)目工程使用文件清
58、單,定期收集各種變更資料,并及時(shí)反饋給有關(guān)人員,技術(shù)保證資料中的各種數(shù)據(jù)必須真實(shí)完整,簽字齊全。 7.2.5 質(zhì)量檢驗(yàn)控制 主要質(zhì)量控制點(diǎn)的質(zhì)量控制措施 由項(xiàng)目部質(zhì)量檢查員、材料員負(fù)責(zé)對(duì)項(xiàng)目部施工過(guò)程中的進(jìn)場(chǎng)物資、施工產(chǎn)品進(jìn)行控制,并對(duì)其檢驗(yàn)狀態(tài)進(jìn)行記錄、標(biāo)識(shí)。 進(jìn)場(chǎng)物資驗(yàn)證合格后,由材料員按批委托試驗(yàn)員進(jìn)行見(jiàn)證取樣,送交具備資質(zhì)的實(shí)驗(yàn)室復(fù)試。復(fù)試合格的物資由項(xiàng)目材料員辦理入庫(kù)手續(xù)。復(fù)試不合格的執(zhí)行不合格品控制。由于工程急需,來(lái)不及進(jìn)行復(fù)試檢驗(yàn)的必須經(jīng)項(xiàng)目技術(shù)負(fù)責(zé)人批準(zhǔn)并取得建設(shè)單位或監(jiān)理單位同意后予以放行。 施工班組對(duì)工序質(zhì)量進(jìn)行自檢,專(zhuān)職質(zhì)檢員對(duì)工序進(jìn)行監(jiān)督檢查,以及交接檢查驗(yàn)收,
59、技術(shù)員負(fù)責(zé)監(jiān)督并做好相應(yīng)記錄。 檢驗(yàn)批或分項(xiàng)工程經(jīng)班組之間、質(zhì)檢員、技術(shù)員核驗(yàn)合格,技術(shù)員填寫(xiě)驗(yàn)收記錄后報(bào)監(jiān)理核查、驗(yàn)收。隱蔽工程驗(yàn)收由項(xiàng)目技術(shù)負(fù)責(zé)人組織項(xiàng)目有關(guān)人員,建設(shè)、監(jiān)理、設(shè)計(jì)等單位參加,檢驗(yàn)合格后方可隱蔽并會(huì)簽紀(jì)錄。 分部工程及單位工程驗(yàn)收應(yīng)在其所含項(xiàng)目全部驗(yàn)收合格后進(jìn)行,其中涉及安全和功能項(xiàng)目抽查應(yīng)符合相關(guān)質(zhì)量驗(yàn)收規(guī)范的規(guī)定。 進(jìn)場(chǎng)物資及施工產(chǎn)品經(jīng)檢驗(yàn)判定為不合格品時(shí)按9.7.2條處置。 7.2.6 不合格品控制 1) 專(zhuān)職質(zhì)檢員負(fù)責(zé)對(duì)不合格產(chǎn)品控制、管理。項(xiàng)目部質(zhì)檢員、相關(guān)技術(shù)員、材料員負(fù)責(zé)對(duì)不合格的采購(gòu)物資、過(guò)程產(chǎn)品進(jìn)行鑒定,項(xiàng)目工程師會(huì)同相關(guān)人員出具評(píng)審、處置方案
60、。 2) 物資進(jìn)場(chǎng)時(shí)經(jīng)過(guò)外觀檢查,認(rèn)為不符合標(biāo)準(zhǔn)要求時(shí),應(yīng)進(jìn)行標(biāo)識(shí),并送交具備資質(zhì)的實(shí)驗(yàn)室復(fù)試。經(jīng)復(fù)試不能滿(mǎn)足要求時(shí),進(jìn)行不合格標(biāo)識(shí),并將不合格信息及時(shí)傳遞有關(guān)人員,進(jìn)行不合格品評(píng)審、處置。 3) 項(xiàng)目專(zhuān)職質(zhì)檢員在現(xiàn)場(chǎng)依據(jù)相關(guān)標(biāo)準(zhǔn)對(duì)工程實(shí)體進(jìn)行檢測(cè),對(duì)于不符合標(biāo)準(zhǔn)規(guī)定的作出不合格狀態(tài)標(biāo)識(shí)。 4) 施工過(guò)程中出現(xiàn)的不合格品的評(píng)審由項(xiàng)目技術(shù)負(fù)責(zé)人和專(zhuān)職質(zhì)檢員實(shí)施。評(píng)審為嚴(yán)重不合格品時(shí),應(yīng)立即向上一級(jí)主管部門(mén)報(bào)告,并提出處置方案。 5) 施工過(guò)程中經(jīng)評(píng)審確認(rèn)為一般不合格品的,由技術(shù)員處理,質(zhì)檢員驗(yàn)證;確認(rèn)為嚴(yán)重不合格品的,由項(xiàng)目技術(shù)負(fù)責(zé)人組織實(shí)施,上一級(jí)主管部門(mén)驗(yàn)證。 6) 上級(jí)部門(mén)、監(jiān)理
61、或甲方及質(zhì)檢部門(mén)對(duì)工程質(zhì)量抽查中發(fā)現(xiàn)的不符合標(biāo)準(zhǔn)問(wèn)題,項(xiàng)目部應(yīng)做不合格品處置,作出標(biāo)識(shí),進(jìn)行評(píng)審,并記錄。 7) 工程交付后在回訪(fǎng)中發(fā)現(xiàn)的不合格品,施工單位保修完成后,由單位質(zhì)檢員和業(yè)主單位共同驗(yàn)證。 7.2.7 糾正預(yù)防措施 對(duì)產(chǎn)生的不合格(不符合)項(xiàng)由項(xiàng)目部技術(shù)負(fù)責(zé)人組織有關(guān)人員進(jìn)行原因分析、整改,并對(duì)采取糾正措施的必要性進(jìn)行評(píng)審。 項(xiàng)目部技術(shù)員負(fù)責(zé)制定環(huán)境、質(zhì)檢員負(fù)制定責(zé)質(zhì)量體系、安全員負(fù)責(zé)制定職業(yè)安全健康體系的糾正措施。糾正措施經(jīng)項(xiàng)目工程師批準(zhǔn)后實(shí)施。 項(xiàng)目部相關(guān)部門(mén)負(fù)責(zé)對(duì)相應(yīng)范圍內(nèi)的糾正措施實(shí)施效果進(jìn)行驗(yàn)證,并填寫(xiě)《糾正/預(yù)防措施記錄表》。 預(yù)防措施 a.項(xiàng)目部在開(kāi)工
62、前根據(jù)工程特點(diǎn)制定預(yù)防措施方案,并由項(xiàng)目工程師批準(zhǔn)后實(shí)施,填寫(xiě)《糾正/預(yù)防措施記錄》。 b.項(xiàng)目部各責(zé)任部門(mén)應(yīng)根據(jù)預(yù)防措施方案,在施工過(guò)程中進(jìn)行跟蹤檢查并做好記錄,每項(xiàng)預(yù)防措施完成后由相應(yīng)責(zé)任部門(mén)對(duì)實(shí)施效果的有效性進(jìn)行驗(yàn)證,并在《糾正/預(yù)防措施記錄》上確認(rèn)。 7.3 技術(shù)保證措施 7.3.1模板工程 1) 根據(jù)混凝土結(jié)構(gòu)工程部位不同,分別采取相應(yīng)的模板體系,框架柱用組合鋼模板,筒壁及附壁柱采用竹膠板模板。為保證達(dá)到創(chuàng)優(yōu)目標(biāo),地上結(jié)構(gòu)達(dá)到清水混凝土效果。 2) 通過(guò)模板體系的計(jì)算,保證模板工程剛度、垂直度、平整度。 3) 為防止墻壁、柱混凝土爛根,立模前模板下應(yīng)抄平,抹找平砂漿。模
63、板檢驗(yàn)完畢,用砂漿補(bǔ)嚴(yán)找平帶空隙,拆模后把砂漿鏟掉。 4) 在豎向模板縫加海綿條密封措施。 7.4 質(zhì)量通病控制措施 7.4.1 鋼筋工程質(zhì)量控制 為保證混凝土保護(hù)層厚度,筒壁及柱采用塑料墊塊。 7.4.2 混凝土工程質(zhì)量控制 1) 配置混凝土?xí)r,應(yīng)嚴(yán)格控制水灰比和水泥用量,選擇級(jí)配良好的石子。 2) 控制出模強(qiáng)度,混凝土強(qiáng)度不小于0.2Mpa。并涂養(yǎng)生液。 3) 混凝土出模后對(duì)其表面應(yīng)及時(shí)進(jìn)行修理。 4) 現(xiàn)澆段混凝土澆搗前,檢查保護(hù)層墊塊厚度數(shù)量.間距是否適當(dāng),發(fā)現(xiàn)問(wèn)題及時(shí)糾正。 5) 加強(qiáng)混凝土澆筑后養(yǎng)護(hù)工作,裸露表面應(yīng)及時(shí)用潮濕材料覆蓋,認(rèn)真養(yǎng)護(hù),氣溫高的
64、天氣應(yīng)進(jìn)行澆水養(yǎng)護(hù),使混凝土保持始終濕潤(rùn)。 7.4.3 專(zhuān)職檢查與消除缺陷控制 1) 在施工階段由質(zhì)量保證部組織專(zhuān)業(yè)質(zhì)檢人員定期進(jìn)行現(xiàn)場(chǎng)巡察,發(fā)現(xiàn)問(wèn)題及時(shí)通知整改。 2) 在施工后期及整套啟動(dòng)試運(yùn)階段,組織一支施工技術(shù)精良,工作認(rèn)真負(fù)責(zé)的高級(jí)技工為主的小分隊(duì),專(zhuān)門(mén)針對(duì)現(xiàn)場(chǎng)出現(xiàn)的工藝、美觀、整潔等不完善處進(jìn)行整改。 3) 對(duì)業(yè)主、上級(jí)質(zhì)監(jiān)部門(mén)質(zhì)監(jiān)中提出的質(zhì)量問(wèn)題進(jìn)行整改并負(fù)責(zé)整改后的驗(yàn)證,對(duì)重大項(xiàng)目及具有普遍性的質(zhì)量問(wèn)題將運(yùn)用統(tǒng)計(jì)技術(shù)進(jìn)行分析,由總工程師制定質(zhì)量改進(jìn)措施并組織實(shí)施進(jìn)行動(dòng)態(tài)受控。所有上級(jí)質(zhì)監(jiān)部門(mén)質(zhì)監(jiān)人員、業(yè)主提出的質(zhì)量問(wèn)題整改驗(yàn)證后,須經(jīng)業(yè)主的復(fù)查、確認(rèn)、簽證后方可轉(zhuǎn)序
65、施工。 7.5 成品保護(hù)措施 7.5.1 模板工程 1) 現(xiàn)場(chǎng)使用模板的裝卸、存放應(yīng)注意保護(hù),分規(guī)格碼放整齊,防止損壞和變形。 2) 模板安裝過(guò)程輕拿輕放,不強(qiáng)拉硬頂,支撐安裝后不可人為隨意拆除造成松動(dòng)。 3) 安裝好的模板要防止鋼筋、腳手架等碰壞模板表面。鋼筋安裝時(shí)保證模板不發(fā)生變形和位移。 4) 模板表面應(yīng)涂刷水溶性脫模劑,防止油污對(duì)混凝土表面造成污染和模板與混凝土之間發(fā)生粘連。模板拆除時(shí)禁止硬砸硬撬,防止損傷模板。 7.5.2 鋼筋工程 1) 鋼筋運(yùn)輸和存放的機(jī)械設(shè)施和施工方法要適當(dāng),鋼筋下應(yīng)使用墊木碼放整齊,嚴(yán)禁野蠻裝卸,防止造成損傷和變形。 2) 鋼筋在安
66、裝、吊運(yùn)過(guò)程中應(yīng)防止變形,墻、柱鋼筋綁扎應(yīng)搭設(shè)架子。鋼筋進(jìn)行穿插時(shí),應(yīng)保護(hù)已綁扎完的鋼筋成品質(zhì)量。安放預(yù)埋管件不得隨意切斷鋼筋。 3) 鋼筋綁扎后按規(guī)定固定好墊塊和支架筋,以保證鋼筋的間距和保護(hù)層。搭設(shè)行人通道,嚴(yán)禁人員直接在鋼筋骨架上行走,以防鋼筋變形。 4) 在混凝土澆筑過(guò)程中,混凝土泵送管道應(yīng)設(shè)專(zhuān)用支架,不準(zhǔn)直接放在鋼筋上造成變形。 5) 設(shè)專(zhuān)人負(fù)責(zé)鋼筋的守護(hù)和整修,保證混凝土澆筑過(guò)程中鋼筋的質(zhì)量。 6) 鋼筋成品、半成品要防止油漆、油脂污染鋼筋表面。 7.5.3 混凝土工程 1) 混凝土澆筑后在強(qiáng)度未達(dá)到1.2MP之前,禁止上人行走,并派專(zhuān)人看護(hù)?;炷潦彰鏁r(shí)操作人員應(yīng)使用腳手板。 2) 混凝土結(jié)構(gòu)的側(cè)模和底模及其支撐的拆除應(yīng)嚴(yán)格執(zhí)行設(shè)計(jì)要求和規(guī)范規(guī)定的強(qiáng)度要求。 3) 拆完模板的梁、板、柱及樓梯等構(gòu)件應(yīng)加強(qiáng)保護(hù),禁止用鋼筋、管件等撞擊,以免造成混凝土表面和棱角損傷。 8 職業(yè)健康安全目標(biāo)及保證措施 8.1 安全生產(chǎn)管理目標(biāo) 建立了完善的職業(yè)安全健康管理體系(GB/T18001-2001)在項(xiàng)目施工中認(rèn)真落實(shí),貫徹公
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 6.煤礦安全生產(chǎn)科普知識(shí)競(jìng)賽題含答案
- 2.煤礦爆破工技能鑒定試題含答案
- 3.爆破工培訓(xùn)考試試題含答案
- 2.煤礦安全監(jiān)察人員模擬考試題庫(kù)試卷含答案
- 3.金屬非金屬礦山安全管理人員(地下礦山)安全生產(chǎn)模擬考試題庫(kù)試卷含答案
- 4.煤礦特種作業(yè)人員井下電鉗工模擬考試題庫(kù)試卷含答案
- 1 煤礦安全生產(chǎn)及管理知識(shí)測(cè)試題庫(kù)及答案
- 2 各種煤礦安全考試試題含答案
- 1 煤礦安全檢查考試題
- 1 井下放炮員練習(xí)題含答案
- 2煤礦安全監(jiān)測(cè)工種技術(shù)比武題庫(kù)含解析
- 1 礦山應(yīng)急救援安全知識(shí)競(jìng)賽試題
- 1 礦井泵工考試練習(xí)題含答案
- 2煤礦爆破工考試復(fù)習(xí)題含答案
- 1 各種煤礦安全考試試題含答案